Creating a Split Shipment (ACE Manifest): Difference between revisions

No edit summary
No edit summary
 
(5 intermediate revisions by the same user not shown)
Line 11: Line 11:
</div>
</div>


<div class="bc-2col">
<div class="bc-card">


<div class="bc-card">
<div class="bc-float-video">
   <div class="bc-video-trigger" data-video-id="ao9MC-VFGQw">
   <div class="bc-video-trigger" data-video-id="ao9MC-VFGQw">
     <div class="bc-play-icon"><i class="fas fa-play-circle"></i></div>
     <div class="bc-play-icon"><i class="fas fa-play-circle"></i></div>
   </div>
   </div>
 
<div class="bc-video-caption">
<strong>Watch Tutorial:</strong> Creating Master and Split Shipments
</div>
</div>
</div>


<div class="bc-card">
<h2 style="margin-top: 0;">Overview</h2>
<h2>Overview</h2>
<p>A <strong>Split Shipment</strong> occurs when a single PAPS entry is transported across the border in multiple loads due to size or operational needs.</p>
<p>A <strong>Split Shipment</strong> occurs when a single PAPS entry is transported across the border in multiple loads due to size or operational needs.</p>
<div class="bc-did-you-know" style="margin-top:10px;">
 
<p>Because the shipment is split, it requires careful coordination to ensure all loads link back to the same Master shipment record in CBP's system.</p>
 
<div class="bc-did-you-know" style="margin-top: 25px;">
<h3>Important Rule</h3>
<h3>Important Rule</h3>
Split shipments must be arranged by the importer/broker <strong>before</strong> the carrier moves the loads. CBP approval is required.
Split shipments must be arranged by the importer/broker <strong>before</strong> the carrier moves the loads. CBP approval is required.
</div>
</div>
</div>


</div>
<div style="clear: both;"></div> </div>
 
<div class="bc-warning" style="margin-top: 30px;">
<div class="bc-warning" style="margin-top: 30px;">
<h3>⚙️ Enable Split Shipments (One-Time Setup)</h3>
<h3>⚙️ Enable Split Shipments (One-Time Setup)</h3>