Creating a Split Shipment (ACE Manifest): Difference between revisions

No edit summary
Tag: Reverted
No edit summary
 
(27 intermediate revisions by the same user not shown)
Line 1: Line 1:
{{note|This article is part of the [[ACE_Manifest_Software_User_Guide_(CBP)|BorderConnect ACE Manifest Guide]]|info}}
<div class="bc-wrap">
<div class="bc-wrap">


<div class="bc-hero">
<div class="bc-article-hero">
<h1>Split Shipments in ACE</h1>
<h1>Split Shipments in ACE</h1>
<p>Learn how to manage shipments that cross the border in multiple loads under a single Shipment Control Number (SCN).</p>
<p>A comprehensive guide to managing shipments that cross the border in multiple loads under a single Shipment Control Number (SCN).</p>
 
<div class="bc-article-meta">
<div class="bc-hero-pills">
<span class="bc-article-pill"><i class="fas fa-chart-line"></i> Difficulty: Intermediate</span>
[[ACE_Manifest_Software_User_Guide_(CBP)|<span class="bc-hero-pill">← Back to ACE Guide</span>]]
<span class="bc-article-pill"><i class="far fa-clock"></i> Time: 10 Minutes</span>
<span class="bc-hero-pill">Difficulty: Intermediate</span>
<span class="bc-hero-pill">Estimated Time: 10 Min</span>
</div>
</div>
</div>
</div>


<div class="bc-2col">
<div class="bc-card">


<div class="bc-card">
<div class="bc-float-video">
<h2>Video Tutorial</h2>
  <div class="bc-video-trigger" data-video-id="ao9MC-VFGQw">
<div class="embedvideo" style="width: 100%; aspect-ratio: 16/9;">
    <div class="bc-play-icon"><i class="fas fa-play-circle"></i></div>
{{#ev:youtube|ao9MC-VFGQw|100%|center|How to create master and split shipments}}
  </div>
</div>
<div class="bc-subtle" style="margin-top:15px; text-align:center;">
Watch the full walkthrough on creating Master and Split shipments.
</div>
</div>
</div>


<div class="bc-card">
<h2 style="margin-top: 0;">Overview</h2>
<h2>What is a Split Shipment?</h2>
<p>A <strong>Split Shipment</strong> occurs when a single PAPS entry is transported across the border in multiple loads due to size or operational needs.</p>
<p>A <strong>Split Shipment</strong> occurs when a single PAPS entry (one SCN) is transported across the border in multiple loads.</p>
 
<div class="bc-did-you-know">
<p>Because the shipment is split, it requires careful coordination to ensure all loads link back to the same Master shipment record in CBP's system.</p>
 
<div class="bc-did-you-know" style="margin-top: 25px;">
<h3>Important Rule</h3>
<h3>Important Rule</h3>
Split shipments must be arranged by the importer or broker <strong>before</strong> moving loads. CBP approval is required.
Split shipments must be arranged by the importer/broker <strong>before</strong> the carrier moves the loads. CBP approval is required.
</div>
</div>
<p style="margin-top:15px;"><strong>The General Workflow:</strong></p>
 
<div style="clear: both;"></div> </div>
 
<div class="bc-warning" style="margin-top: 30px;">
<h3>⚙️ Enable Split Shipments (One-Time Setup)</h3>
Before starting, ensure this is enabled in your account:
<div class="bc-cleanlist">
<div class="bc-cleanlist">
* <strong>Step 1:</strong> Create & Send the <strong>Master Shipment</strong> (Total Quantity).
* Go to <strong>Account → Company Settings</strong>.
* <strong>Step 2:</strong> Wait for CBP Acceptance.
* Under <strong>ACE Shipment Settings</strong>, set <strong>Allow ACE "Split Shipments"</strong> to <strong>Yes</strong>.
* <strong>Step 3:</strong> Create <strong>Split Segments</strong> for each physical truckload.
* Click <strong>Save</strong>.
</div>
</div>
[[File:Allow-split-shipments.png|800px|class=bc-screenshot|link=]]
</div>
</div>


</div> <div class="bc-note-table" style="margin-bottom: 30px;">
<h2 style="margin-top: 40px; border-bottom: 2px solid #eee; padding-bottom: 10px;">Phase 1: The Master Shipment</h2>
<h3>⚙️ One-Time Setup Required</h3>
<p>The Master Shipment holds the <strong>total quantity</strong> for all loads combined. It is created first and sent to CBP as an "Unassociated" shipment.</p>
<p>Before you can process split shipments, you must enable this setting in your account:</p>
<ol>
<li>Go to <strong>Account</strong> → <strong>Company Settings</strong>.</li>
<li>Under <strong>ACE Shipment Settings</strong>, set <strong>Allow ACE "Split Shipments"</strong> to <strong>Yes</strong>.</li>
<li>Click <strong>Save</strong>.</li>
</ol>
</div>


<div class="bc-card" style="margin-bottom:30px;">
<div class="bc-card">
<h2>Phase 1: The Master Shipment</h2>
<h3><span class="bc-step-circle">1</span> Create the Shipment</h3>
<p class="bc-subtle">The master shipment holds the total quantity for all segments combined. It is never attached to a manifest directly.</p>
 
<div class="bc-grid">
<div>
<h3>1. Create the Shipment</h3>
<div class="bc-cleanlist">
<div class="bc-cleanlist">
* Navigate to <strong>ACE eManifests</strong> <strong>Start New ACE Shipment</strong>.
* Navigate to <strong>ACE eManifests → Start New ACE Shipment</strong>.
* Enter the <strong>SCN (PAPS)</strong>, Shipper, Consignee, and Commodity.
* Enter the <strong>SCN (PAPS)</strong>, Shipper, Consignee, and Commodity.
* <strong>Crucial:</strong> Enter the <strong>Total Quantity</strong> for all loads combined.
* <strong>Crucial:</strong> Enter the Total Quantity for <strong>all loads combined</strong>.
* Click <strong>Save</strong>.
* Click <strong>Save</strong>.
</div>
</div>
</div>
[[File:Start-ace-shipment.png|800px|class=bc-screenshot|link=]]
<div>
 
<h3>2. Send to CBP</h3>
<h3><span class="bc-step-circle">2</span> Send to CBP</h3>
<div class="bc-cleanlist">
<div class="bc-cleanlist">
* On the Shipment Details page, hover over <strong>Shipment Only Send to CBP</strong>.
* On the Shipment Details page, hover over the menu <strong>Shipment Only Send to CBP</strong>.
* Select <strong>Send Unassociated Shipment</strong>.
* Select <strong>Send Unassociated Shipment</strong>.
* Wait for the status to change to <strong>Accepted</strong>.
* Wait for the status to change to <strong>Accepted</strong>.
</div>
</div>
</div>
[[File:Send-unassociated-shipment.png|800px|class=bc-screenshot|link=]]
</div>
</div>
</div>


<div class="bc-card" style="margin-bottom:30px;">
<h2 style="margin-top: 40px; border-bottom: 2px solid #eee; padding-bottom: 10px;">Phase 2: The Split Segments</h2>
<h2>Phase 2: The Split Segments</h2>
<p>Once the Master is accepted, create a separate manifest for every physical truckload.</p>
<p class="bc-subtle">Each physical truck crossing the border gets its own "Segment" linked to the Master.</p>


<div class="bc-grid">
<div class="bc-card">
<div>
<h3><span class="bc-step-circle">1</span> Link the Segment</h3>
<h3>1. Start the Manifest</h3>
<div class="bc-cleanlist">
<div class="bc-cleanlist">
* Navigate to <strong>Start New ACE eManifest</strong>.
* Start a <strong>New ACE eManifest</strong> and enter Trip/Driver info.
* Enter Trip #, Port, ETA, Truck, Trailer, and Driver.
* Click <strong>Save and Start New ACE Shipment</strong>.
* Click <strong>Save and Start New ACE Shipment</strong>.
</div>
</div>
<div>
<h3>2. Link the Segment</h3>
<div class="bc-cleanlist">
* Enter the <strong>Same SCN</strong> used for the Master.
* Enter the <strong>Same SCN</strong> used for the Master.
* Check the box: ☑ <strong>Split Shipment Segment</strong>.
* Check the box: ☑ <strong>Split Shipment Segment</strong>.
* Enter the quantity for <strong>this specific load only</strong>.
* Enter the quantity for <strong>this specific load only</strong>.
* Click <strong>Save</strong>. Commodity info will auto-fill from the Master.
</div>
</div>
[[File:Split-segment.png|800px|class=bc-screenshot|link=]]
<div class="bc-pro-tip">
<strong>Final Step:</strong> Click <strong>Save</strong> (commodity info will auto-fill), then click <strong>Sync with CBP</strong>. Repeat this for every load until the total quantity reaches zero.
</div>
</div>
</div>
</div>


<div class="bc-pro-tip">
<div class="bc-card" style="margin-top: 30px;">
<strong>Final Step:</strong> Return to the eManifest page and click <strong>Sync with CBP</strong>. The segment should be accepted within 30–60 seconds. Repeat this for every load until the total quantity reaches zero.
<h3>Visual Workflow</h3>
</div>
[[File:Split-shipment-diagram.png|800px|class=bc-screenshot|link=]]
</div>
</div>


<div class="bc-card">
<div class="bc-card" style="margin-top: 30px;">
<h2>Master vs. Segment: Key Differences</h2>
<h3>Quick Reference</h3>
{| class="wikitable" style="width:100%; text-align:left;"
{| class="wikitable" style="width:100%; margin-bottom:0;"
! Feature
! Feature
! Master Shipment
! Master Shipment
! Split Shipment Segment
! Split Segment
|-
|-
| <strong>Sequence</strong>
| <strong>Sequence</strong>
Line 115: Line 100:
|-
|-
| <strong>Manifest Status</strong>
| <strong>Manifest Status</strong>
| Unassociated (Not on manifest)
| Unassociated (Standalone)
| Attached to eManifest
| Attached to eManifest
|-
|-
| <strong>Quantity</strong>
| <strong>Quantity</strong>
| Total of all loads combined
| Total (All Loads)
| Only what is on the truck
| Partial (Truck Load)
|-
| <strong>Commodity Data</strong>
| Manually entered
| Auto-pulled from Master
|}
|}
</div>
<h2 style="margin-top:40px; border-bottom: 2px solid #ddd; padding-bottom:10px;">Making Changes & Corrections</h2>
<div class="bc-grid">
<div class="bc-card">
<h3>Changing Quantity on a Segment</h3>
<ol>
<li><strong>Detach</strong> the shipment from the manifest.</li>
<li><strong>Cancel</strong> the eManifest to reset the status.</li>
<li>Reattach utilizing <strong>Quick Assign Shipment</strong>.</li>
<li>Edit the quantity and <strong>Save</strong>.</li>
<li>Resubmit by clicking <strong>Sync with CBP</strong>.</li>
</ol>
</div>
<div class="bc-card">
<h3>Changing the Master SCN</h3>
<ol>
<li>Locate the master via <strong>Search ACE Shipments</strong>.</li>
<li>Select <strong>Cancel Shipment Message</strong>.</li>
<li>Cancel all manifests containing segments.</li>
<li>Edit the SCN and Save.</li>
<li>Resend <strong>Unassociated Shipment</strong>.</li>
</ol>
</div>
</div>
</div>