Creating a Split Shipment (ACE Manifest): Difference between revisions
Tag: Undo |
No edit summary |
||
| Line 1: | Line 1: | ||
<div class="bc-wrap"> | |||
<div class="bc-hero"> | |||
<h1>Split Shipments in ACE</h1> | |||
<p>Manage shipments crossing the border in multiple loads under a single Shipment Control Number (SCN).</p> | |||
[[ | <div class="bc-hero-pills"> | ||
[[ACE_Manifest_Software_User_Guide_(CBP)|<span class="bc-hero-pill">← Back to Guide</span>]] | |||
<span class="bc-hero-pill">Difficulty: Intermediate</span> | |||
<span class="bc-hero-pill">Time: 10 Mins</span> | |||
</div> | |||
</div> | |||
<div class="bc-2col"> | |||
Split shipments | <div class="bc-card"> | ||
<div class="embedvideo" style="width: 100%; aspect-ratio: 16/9;"> | |||
{{#ev:youtube|ao9MC-VFGQw|100%|center}} | |||
</div> | |||
<div class="bc-subtle" style="text-align:center; margin-top:10px;"> | |||
<strong>Watch:</strong> How to create Master & Split shipments. | |||
</div> | |||
</div> | |||
<div class="bc-card"> | |||
<h2>Overview</h2> | |||
<p>A <strong>Split Shipment</strong> is when one PAPS entry (one SCN) is transported in multiple loads.</p> | |||
<div class="bc-did-you-know"> | |||
<h3>Important Rule</h3> | |||
Split shipments must be approved by the Port and arranged by the broker <strong>before</strong> the driver moves. | |||
</div> | |||
<p><strong>The Process:</strong></p> | |||
<div class="bc-cleanlist"> | |||
* <strong>Master Shipment:</strong> Holds the total quantity. | |||
* <strong>Split Segments:</strong> Individual loads linked to Master. | |||
* <strong>Sync:</strong> Each load is synced as it crosses. | |||
</div> | |||
</div> | |||
</div> | |||
<div class="bc-warning"> | |||
<strong>First Time Setup:</strong> Go to <strong>Account → Company Settings</strong> and set <strong>Allow ACE "Split Shipments"</strong> to <strong>Yes</strong>. | |||
</div> | |||
<div class="bc-card" style="margin-top: 25px;"> | |||
<h2>Step 1: The Master Shipment</h2> | |||
<p class="bc-subtle">The Master Shipment is a container for the total quantity. It is <strong>never</strong> attached to a manifest.</p> | |||
<div class="bc-grid"> | |||
<div> | |||
<h3>Create</h3> | |||
<div class="bc-cleanlist"> | |||
* Go to <strong>ACE eManifests → Start New ACE Shipment</strong>. | |||
* Enter the <strong>SCN (PAPS)</strong> and Shipper/Consignee details. | |||
* Enter the <strong>Total Quantity</strong> for all loads combined. | |||
* Click <strong>Save</strong>. | |||
</div> | |||
</div> | |||
<div> | |||
<h3>Send</h3> | |||
<div class="bc-cleanlist"> | |||
* On the Shipment Details page, hover over the "Send to CBP" menu. | |||
* Click <strong>Send Unassociated Shipment</strong>. | |||
* Wait for the status to change to <strong>Accepted</strong>. | |||
</div> | |||
</div> | |||
</div> | |||
</div> | |||
== | <div class="bc-card" style="margin-top: 25px;"> | ||
<h2>Step 2: The Split Segments</h2> | |||
<p class="bc-subtle">Create a separate manifest for every physical truckload crossing the border.</p> | |||
<div class="bc-grid"> | |||
<div> | |||
<h3>Create Manifest</h3> | |||
<div class="bc-cleanlist"> | |||
* Start a <strong>New ACE eManifest</strong>. | |||
* Enter Trip, Port, Truck, and Driver info. | |||
* Click <strong>Save and Start New ACE Shipment</strong>. | |||
</div> | |||
</div> | |||
<div> | |||
<h3>Link Segment</h3> | |||
<div class="bc-cleanlist"> | |||
* Use the <strong>Same SCN</strong> as the Master. | |||
* Check the box: ☑ <strong>Split Shipment Segment</strong>. | |||
* Enter quantity for <strong>this load only</strong>. | |||
* Click <strong>Save</strong> (Commodity info auto-fills). | |||
</div> | |||
</div> | |||
</div> | |||
<div class="bc-pro-tip"> | |||
<strong>Final Step:</strong> Go back to the eManifest and click <strong>Sync with CBP</strong>. Repeat this for every load until the total quantity is zero. | |||
</div> | |||
</div> | |||
<div class="bc-card" style="margin-top: 25px;"> | |||
<h2>Reference: Master vs. Segment</h2> | |||
= | {| class="wikitable" style="width:100%; margin-bottom:0;" | ||
{| class="wikitable" | |||
! Feature | ! Feature | ||
! Master Shipment | ! Master Shipment | ||
! Split | ! Split Segment | ||
|- | |- | ||
| | | <strong>Sequence</strong> | ||
| | | Created First | ||
| | | Created Second | ||
|- | |- | ||
| | | <strong>Manifest Status</strong> | ||
| | | Unassociated (Standalone) | ||
| | | Attached to eManifest | ||
|- | |- | ||
| Quantity | | <strong>Quantity</strong> | ||
| Total | | Total (All Loads) | ||
| | | Partial (Truck Load) | ||
|} | |} | ||
</div> | |||
{{AppPromo}} | |||
{ | |||
[[Category:ACE Manifest Guide]] | </div> [[Category:ACE Manifest Guide]] | ||
Revision as of 15:14, 4 February 2026
Split Shipments in ACE
Manage shipments crossing the border in multiple loads under a single Shipment Control Number (SCN).
← Back to Guide Difficulty: Intermediate Time: 10 Mins
Watch: How to create Master & Split shipments.
Overview
A Split Shipment is when one PAPS entry (one SCN) is transported in multiple loads.
Important Rule
Split shipments must be approved by the Port and arranged by the broker before the driver moves.
The Process:
- Master Shipment: Holds the total quantity.
- Split Segments: Individual loads linked to Master.
- Sync: Each load is synced as it crosses.
First Time Setup: Go to Account → Company Settings and set Allow ACE "Split Shipments" to Yes.
Step 1: The Master Shipment
The Master Shipment is a container for the total quantity. It is never attached to a manifest.
Create
- Go to ACE eManifests → Start New ACE Shipment.
- Enter the SCN (PAPS) and Shipper/Consignee details.
- Enter the Total Quantity for all loads combined.
- Click Save.
Send
- On the Shipment Details page, hover over the "Send to CBP" menu.
- Click Send Unassociated Shipment.
- Wait for the status to change to Accepted.
Step 2: The Split Segments
Create a separate manifest for every physical truckload crossing the border.
Create Manifest
- Start a New ACE eManifest.
- Enter Trip, Port, Truck, and Driver info.
- Click Save and Start New ACE Shipment.
Link Segment
- Use the Same SCN as the Master.
- Check the box: ☑ Split Shipment Segment.
- Enter quantity for this load only.
- Click Save (Commodity info auto-fills).
Final Step: Go back to the eManifest and click Sync with CBP. Repeat this for every load until the total quantity is zero.
Reference: Master vs. Segment
| Feature | Master Shipment | Split Segment |
|---|---|---|
| Sequence | Created First | Created Second |
| Manifest Status | Unassociated (Standalone) | Attached to eManifest |
| Quantity | Total (All Loads) | Partial (Truck Load) |