Creating a Split Shipment (ACE Manifest)
|
🔖 This article is part of the BorderConnect ACE Manifest Guide |

A Split Shipment occurs when a single PAPS entry (one shipment control number) is transported across the border in multiple loads due to shipment size or operational needs.
Split shipments are arranged by the importer or customs broker, who obtains approval from the CBP port before the carrier begins moving the loads.
Carriers should only process split shipments when instructed by the broker or importer.
How Split Shipments Work in ACE
One master shipment is created first to represent the total quantity. Each physical load is then created as a split shipment segment linked to that master.
Simple flow:
Master shipment submitted → CBP accepts master → Split shipment segments created → Each segment synced as loads cross
Enabling Split Shipments
Before creating split shipments:
- Go to Account → Company Settings
- Under ACE Shipment Settings set Allow ACE "Split Shipments" to Yes
- Click Save
This only needs to be done once per account.
Creating the Master Shipment
The master shipment holds the total quantity for all segments.
Step-by-Step
- Navigate to ACE eManifests → Start New ACE Shipment
- Enter the Shipment Control Number (PAPS number)
- Enter shipper, consignee, and commodity information
- Set the quantity as the total quantity for all loads combined
- Click Save

Sending the Master Shipment to CBP
From the Shipment Details page:
- Hover over Shipment Only Send to CBP
- Select Send Unassociated Shipment
- Wait for CBP acceptance

Once accepted, split shipment segments may be created.
Creating Split Shipment Segments
Each load crossing the border is entered as a split segment.
Step-by-Step
- Navigate to ACE eManifests → Start New ACE eManifest
- Enter trip number, port, ETA, truck, trailer, and driver
- Click Save and Start New ACE Shipment
- Enter the same Shipment Control Number used for the master
- Check Split Shipment Segment
- Enter the quantity on this load only
- Click Save

Commodity information is pulled automatically from the master shipment.
Return to the eManifest and click Sync with CBP.
Within 30 to 60 seconds the segment should be accepted.
Repeat for every load until the total quantity reaches zero.
Master Shipment vs Split Shipment Segment
| Feature | Master Shipment | Split Shipment Segment |
|---|---|---|
| Created first | Yes | No |
| Attached to manifest | No | Yes |
| Quantity | Total of all loads | Individual load amount |
| Commodity info | Entered once | Pulled automatically |
| Shipment control number | Same number | Same number |

Making Changes or Cancellations
Changing Quantity on a Split Segment
- Detach the shipment from the manifest
- Cancel the eManifest
- Reattach the shipment using Quick Assign Shipment
- Edit the quantity and save
- Return to the eManifest and click Sync with CBP
Removing a Split Shipment Segment
- Detach the shipment from the manifest
- Cancel the eManifest
Changing the Master Shipment Control Number
- Locate the unassociated master shipment using Search ACE Shipments
- Open the shipment and select Cancel Shipment Message
- Cancel all manifests containing split segments
- Edit the master shipment control number and save
- Send Unassociated Shipment again to CBP
- Update each split manifest and sync with CBP
Best Practices
| Tip | Why It Matters |
|---|---|
| Always create master shipment first | CBP requires it for segments |
| Match total quantities exactly | Prevent rejections |
| Sync each segment individually | Proper CBP processing |
| Follow broker instructions | Ensures port approval |